POWER PLANT BOILER CONSTRUCTION AND INSTALLATION

image01

Russian Company (Technoprom Export )

Project Name: Rehabilitation of units 2&3 in AL-Hartha TPS (POWER PLANT BOILER CONSTRUCTION AND INSTALLATION).

Year: 2011-2015

Cost in USD: 11,000,000 USD

Location: Iraq- Basra-Al-Hartha

Short Description:This boiler is belongs to the ministry of electricity, we have worked as subcontractor for the TPE Russian CO. (TechnoPromExport), our staffs have started the work from the zero level up to the level 52m, the steel structure weight for this project is around 5000 tons of structure, water walls , superheaters , economizers , steam drum, rigidity belts , hangers for walls and canopy, it is sending 200 MW to the turbine which is also our companyresponsibility to make the rehabilitation, the structure work has been facilitated with all the required equipment for heavy work, cranes , heavy trucks for transportation and mobilization, also excavation machines for civil work as we also involved to do all the foundations for the pipe rack and air draft fans, duct foundation, cable trenches , water treatment plants buildings and many lateral facilities, also we have involved to do all the turbine work the generator, high pressure , intermediate pressure and the low pressure, ware now in the final steps to complete the work successfully .

This boiler is belongs to the ministry of electricity, we have worked as subcontractor for the TPE Russian CO. (TechnoPromExport), our staffs have started the work from the zero level up to the level 52m, the steel structure weight for this project is around 5000 tons of structure, water walls , superheaters , economizers , steam drum, rigidity belts , hangers for walls and canopy, it is sending 200 MW to the turbine which is also our company responsibility to make the rehabilitation, the structure work has been facilitated with all the required equipment for heavy work, cranes , heavy trucks for transportation and mobilization, also excavation machines for civil work as we also involved to do all the foundations for the pipe rack and air draft fans, duct foundation, cable trenches , water treatment plants buildings and many lateral facilities, also we have involved to do all the turbine work the generator, high pressure , intermediate pressure and the low pressure, ware now in the final steps to complete the work successfully